Form of Safety Construction Certificate for Cargo Ships

Form of Safety Construction Certificate for Cargo Ships

CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE

Issued under the provisions of the
INTERNATIONAL CONVENTION FOR THE SAFETY OF LIFE AT SEA, 1974, as modified by the Protocol of 1988 relating thereto

under the authority of the Government of

(name of the State)

by

(person or organization authorized)

Particulars of ship

Name of ship

Distinctive number or letters

Port of registry

Gross tonnage

Deadweight of ship (metric tons)[1]

IMO Number[2]

Type of ship[3]

              Bulk carrier

              Oil tanker

              Chemical tanker

              Gas carrier

              Cargo ship other than any of the above

Date on which keel was laid or ship was at a similar stage of construction or, where applicable, date on which work for a conversion or an alteration or modification of a major character was commenced

THIS IS TO CERTIFY:

1              That the ship has been surveyed in accordance with the requirements of regulation I/10 of the Convention.

2              That the survey showed that the condition of the structure, machinery and equipment as defined in the above regulation was satisfactory and the ship complied with the relevant requirements of chapters II-1 and II-2 of the Convention (other than those relating to fire safety systems and appliances and fire control plans).

3              That the last two inspections of the outside of the ship's bottom took place on [date] and [date].

4              That an Exemption Certificate has/has not[4] been issued.

This certificate is valid until [date][5] subject to the annual and intermediate surveys and inspections of the outside of the ship's bottom in accordance with regulation I/10 of the Convention.

Issued at

(Place of issue of certificate)

(Date of issue)

(Signature of authorized official issuing the certificate)

(Seal or stamp of the issuing authority, as appropriate)


ENDORSEMENT FOR ANNUAL AND INTERMEDIATE SURVEYS

THIS IS TO CERTIFY that, at a survey required by regulation I/10 of the Convention, the ship was found to comply with the relevant requirements of the Convention.

Annual survey:

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)

Annual/Intermediate[6] survey:

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)

Annual/Intermediate6 survey:

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)

Annual survey:

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)


ANNUAL/INTERMEDIATE SURVEY IN ACCORDANCE WITH REGULATION I/14(h)(iii)

THIS IS TO CERTIFY that, at an annual/intermediate survey[7] in accordance with regulation I/14(h)(iii) of the Convention, this ship was found to comply with the relevant requirements of the Convention.

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)


ENDORSEMENT FOR INSPECTIONS OF THE OUTSIDE OF THE SHIP'S BOTTOM[8]

THIS IS TO CERTIFY that, at an inspection required by regulation I/10 of the Convention, the ship was found to comply with the relevant requirements of the Convention.

First inspection:

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)

Second inspection:

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)


ENDORSEMENT TO EXTEND THE CERTIFICATE IF VALID FOR LESS THAN 5 YEARS WHERE REGULATION I/14(c) APPLIES

The ship complies with the relevant requirements of the Convention, and this certificate shall, in accordance with regulation I/14(c) of the Convention, be accepted as valid until [date]

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)


ENDORSEMENT WHERE THE RENEWAL SURVEY HAS BEEN COMPLETED AND REGULATION I/14(d) APPLIES

The ship complies with the relevant requirements of the Convention, and this certificate shall, in accordance with regulation I/14(d) of the Convention, be accepted as valid until [date]

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)


ENDORSEMENT TO EXTEND THE VALIDITY OF THE CERTIFICATE UNTIL REACHING THE PORT OF SURVEY OR FOR A PERIOD OF GRACE WHERE REGULATION I/14(e) OR I/14(f) APPLIES

The certificate shall, in accordance with regulation I/14(e)/I/14(f)[9] of the Convention, be accepted as valid until [date]

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)


ENDORSEMENT FOR ADVANCEMENT OF ANNIVERSARY DATE WHERE REGULATION I/14(h) APPLIES

In accordance with regulation I/14(h) of the Convention, the new anniversary date is

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)

In accordance with regulation I/14(h) of the Convention, the new anniversary date is

Signed:

(Signature of authorized official)

Place:

Date:

(Seal or stamp of the authority, as appropriate)

 


[1] For oil tankers, chemical tankers and gas carriers only.

[2] In accordance with IMO ship identification number scheme adopted by the Organization by resolution A.600(15).

[3] Delete as appropriate

[4] Delete as appropriate

[5] Insert the date of expiry as specified by the Administration in accordance with regulation I/14(a) of the Convention. The day and the month of this date correspond to the anniversary date, as defined in regulation I/2(n) of the Convention, unless amended in accordance with regulation I/4(h).

[6] Delete as appropriate

[7] Delete as appropriate

[8] Provision may be made for additional inspections.

[9] Delete as appropriate

Zgłoś jeśli naruszono regulamin