Fieldbus technology Profibus-DP (Workbook)
Fieldbus technology
Profibus-DP
Workbook
TP 402
IM 151 CPU
IM 151 CPU
FRCE
SF
FRCE
SF
BF
ON
RU N
STOP
BF
ON
RU N
STOP
STO P
MRES
STO P
M RES
PROFIBU S-DP
PROFIBU S-DP
MMC
15
26
15
26
15
26
15
15
26
15
26
MMC
15
26
15
26
15
26
15
15
26
15
26
ET 20 0 S
DP
ADDRESS
OFF ON
ET 20 0 S
DP
ADDRESS
OFF ON
CPU 313C-2 DP
CP 343- 2
SF
BF
PW R
DC5V
CER
APF
14 14 14 14 14
12 12 12
MMN E
14 14 14 14 14
12 12 12
MMN E
RU N
AUP
STO P
CM
RU N
PU SH
STO P
MRES
B
20 +
10 +
IN
OUT
A
MPI
DP
B
534 273 EN
RU N
RU N
FRCE
251550197.196.png 251550197.207.png 251550197.218.png 251550197.229.png 251550197.001.png 251550197.012.png 251550197.023.png 251550197.034.png 251550197.045.png 251550197.056.png 251550197.067.png 251550197.078.png 251550197.086.png 251550197.096.png 251550197.107.png 251550197.118.png 251550197.129.png 251550197.140.png 251550197.151.png 251550197.161.png 251550197.162.png 251550197.163.png 251550197.164.png 251550197.165.png 251550197.166.png 251550197.167.png 251550197.168.png 251550197.169.png 251550197.170.png 251550197.171.png 251550197.172.png 251550197.173.png 251550197.174.png 251550197.175.png 251550197.176.png 251550197.177.png 251550197.178.png 251550197.179.png 251550197.180.png 251550197.181.png 251550197.182.png 251550197.183.png 251550197.184.png 251550197.185.png 251550197.186.png 251550197.187.png 251550197.188.png 251550197.189.png 251550197.190.png 251550197.191.png 251550197.192.png 251550197.193.png 251550197.194.png 251550197.195.png 251550197.197.png 251550197.198.png 251550197.199.png 251550197.200.png 251550197.201.png 251550197.202.png 251550197.203.png 251550197.204.png 251550197.205.png 251550197.206.png 251550197.208.png 251550197.209.png 251550197.210.png 251550197.211.png 251550197.212.png 251550197.213.png 251550197.214.png 251550197.215.png 251550197.216.png 251550197.217.png 251550197.219.png 251550197.220.png 251550197.221.png 251550197.222.png 251550197.223.png 251550197.224.png 251550197.225.png 251550197.226.png 251550197.227.png 251550197.228.png 251550197.230.png 251550197.231.png 251550197.232.png 251550197.233.png 251550197.234.png 251550197.235.png 251550197.236.png 251550197.237.png 251550197.238.png 251550197.239.png 251550197.002.png 251550197.003.png 251550197.004.png 251550197.005.png 251550197.006.png 251550197.007.png 251550197.008.png 251550197.009.png 251550197.010.png 251550197.011.png 251550197.013.png 251550197.014.png 251550197.015.png 251550197.016.png 251550197.017.png 251550197.018.png 251550197.019.png 251550197.020.png 251550197.021.png 251550197.022.png 251550197.024.png 251550197.025.png 251550197.026.png 251550197.027.png 251550197.028.png 251550197.029.png 251550197.030.png 251550197.031.png 251550197.032.png 251550197.033.png 251550197.035.png 251550197.036.png 251550197.037.png 251550197.038.png 251550197.039.png 251550197.040.png 251550197.041.png 251550197.042.png 251550197.043.png 251550197.044.png 251550197.046.png 251550197.047.png 251550197.048.png 251550197.049.png 251550197.050.png 251550197.051.png 251550197.052.png 251550197.053.png 251550197.054.png 251550197.055.png 251550197.057.png 251550197.058.png 251550197.059.png 251550197.060.png 251550197.061.png 251550197.062.png 251550197.063.png 251550197.064.png 251550197.065.png 251550197.066.png 251550197.068.png 251550197.069.png 251550197.070.png 251550197.071.png 251550197.072.png 251550197.073.png 251550197.074.png 251550197.075.png 251550197.076.png 251550197.077.png 251550197.079.png 251550197.080.png 251550197.081.png 251550197.082.png 251550197.083.png 251550197.084.png 251550197.085.png 251550197.087.png 251550197.088.png 251550197.089.png 251550197.090.png 251550197.091.png 251550197.092.png 251550197.093.png 251550197.094.png 251550197.095.png 251550197.097.png 251550197.098.png 251550197.099.png 251550197.100.png 251550197.101.png 251550197.102.png 251550197.103.png 251550197.104.png 251550197.105.png 251550197.106.png 251550197.108.png 251550197.109.png 251550197.110.png 251550197.111.png 251550197.112.png 251550197.113.png 251550197.114.png 251550197.115.png 251550197.116.png 251550197.117.png 251550197.119.png 251550197.120.png 251550197.121.png 251550197.122.png 251550197.123.png 251550197.124.png 251550197.125.png 251550197.126.png 251550197.127.png 251550197.128.png 251550197.130.png 251550197.131.png 251550197.132.png 251550197.133.png 251550197.134.png 251550197.135.png 251550197.136.png 251550197.137.png 251550197.138.png 251550197.139.png 251550197.141.png 251550197.142.png 251550197.143.png 251550197.144.png 251550197.145.png 251550197.146.png 251550197.147.png 251550197.148.png 251550197.149.png 251550197.150.png 251550197.152.png 251550197.153.png 251550197.154.png 251550197.155.png 251550197.156.png 251550197.157.png 251550197.158.png 251550197.159.png 251550197.160.png
Order No.
534 273
Description:
WORKBOOK
Designation:
D:LW-TP402-EN
Status:
08/2003
Authors:
Monika Bliesener, Sabine Scharf
Graphic:
Doris Schwarzenberger
Layout:
06.08.2003, Beatrice Huber
© Festo Didactic GmbH & Co. KG, 73770 Denkendorf, Germany, 2003
Internet: www.festo.com/didactic
E-Mail: did@festo.com
The copying, distribution and utilization of this document as well as the
communication of its contents to others without express authorisation is prohibited.
Offenders will be held liable for the payment of damages. All rights reserved, in
particular the right to carry out patent, utility model or ornamental design
registration.
Contents
Introduction __________________________________________________________ 5
Notes on safety and procedure _________________________________________ 15
Part A – Exercises
Project 1 Pneumatic door control_______________________________________A-3
Project 2 Pneumatic door control with Profibus valve terminal ______________A-11
Project 3 Pneumatic door control with Profibus valve terminal
and intelligent slave ________________________________________A-39
Project 4 Profibus-DP system with stack magazine _______________________A-81
Project 5 Profibus-DP system with stack magazine and changer module ______A-95
Part B – Fundamentals
1.
What is a fieldbus system? ______________________________________B-3
1.1
Why fieldbus systems at all? _____________________________________B-4
1.2
Where in a factory is the fieldbus allocated? ________________________B-5
1.3
The allocation of fieldbus systems ________________________________B-9
1.4
Summary __________________________________________________ B-10
2.
Message exchange within a fieldbus system ______________________ B-12
2.1
Master/Slave _______________________________________________ B-12
2.2
Address of station, bus station _________________________________ B-15
2.3
Topology __________________________________________________ B-15
2.4
Data transfer _______________________________________________ B-16
2.5
ISO/OSI reference model _____________________________________ B-17
2.6
Summary __________________________________________________ B-18
3.
Four different fieldbus concepts and types thereof _________________ B-20
3.1
The message orientated concept _______________________________ B-20
3.2
The station orientated concept _________________________________ B-21
3.3
The multi-master concept _____________________________________ B-23
3.4
The installation concept ______________________________________ B-24
3.5
Fieldbus types and their areas of application _____________________ B-26
3.6
Summary __________________________________________________ B-27
© Festo Didactic GmbH & Co. KG • TP 402
3
Contents
4.
The Profibus-DP _____________________________________________ B-28
4.1
Fundamentals ______________________________________________ B-29
4.2
Topology of Profibus-DP ______________________________________ B-30
4.3
Mode of operation of Profibus-DP ______________________________ B-34
4.4
CPU with integrated Profibus-DP master _________________________ B-35
4.5
CPU and external Profibus-DP master ___________________________ B-37
4.6
Active and passive slaves _____________________________________ B-40
4.7
Summary __________________________________________________ B-42
Part C – Solutions
Project 1 Pneumatic door control_______________________________________C-3
Project 2 Pneumatic door control with Profibus valve terminal _______________C-5
Project 3 Pneumatic door control with Profibus valve terminal
and intelligent slave _________________________________________C-7
Project 4 Profibus-DP system with stack magazine _______________________C-13
Project 5 Profibus-DP system with stack magazine and changer module ______C-19
Part D – Appendix
Glossary ___________________________________________________________ D-3
Bibliography ______________________________________________________ D-17
4
© Festo Didactic GmbH & Co. KG • TP 402
Introduction
The training package TP 402 Profibus-DP contains equipment and components for
automation and industrial communication. The example of a Profibus-DP is used to
impart knowledge about fieldbus technology and to acquire the professional skills
to deal with such systems.
Training contents
The general training aim to be achieved with this training package is the ability
to design
to configure
and to commission a Profibus-DP system
With this aim in mind, topics are also discussed that are independent of a special
bus system:
Topology of a fieldbus system, master and slave
Addressing of fieldbus components
Interfaces and connections
Data transfer
Significance of these
training contents in
professional practice
The currently occurring, highly dynamic development of networked automation
systems facilitates new types of problem solutions for process technology,
telecontrol technology and remote maintenance.
The aim of industrial communication is to solve automation tasks using a single,
completely integrated and contiguous communication system that is open to office
networks. The benefit of networking is in the cost saving for hardware, assembly and
maintenance.
The configuration and commissioning of such networked automation systems has
not previously been taught in vocational training or if so only in rudimentary form.
An almost 100 % availability is required from a finished installation. In the event of
malfunction, maintenance personnel need to be supported by targeted messages
from the system.
Here too, industrial communication is therefore a relevant training subject.