Module Title:-Cable Calculation

Module Title:-Cable Calculation

Subjects covered:-

Basic cable calculations;

o Design current;

o Installation methods;

o Grouping;

o Ambient temperatures;

o Protection device choice;

o Volt drop.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable Calculation

When trying to determine the size of conductors necessary for the safe working of a

circuit many factors need to be considered. It is not acceptable to guess or to use cable

sizes that are in common usage just because someone may say that you should use

1.5mm2 ‘twin and earth’. You may just be wrong!

 

 

 

If you get cable sizes wrong, then there may be a fire risk or you may be wasting money

on excessive material.

 

 

 

To get an idea of what is required it is worthwhile working through an example, noting

some of the areas of concern as we progress.

 

 

 

 

1/. A 3kW heater is supplied from a 230V, 50Hz supply. The circuit is protected

using BS3036 (rewirable) fuses and is situated 15m away from the distribution

board. It is run with one other circuit and is buried within the building material

of the installation. The temperature within the installation can be assumed to

be 25°C. Determine:-

i/. The design current;

ii/. The fuse rating;

iii/. The smallest possible cable size;

iv/. The volt drop within the cable.

This is a typical question and needs to be approached in a systematic way. Do not try to

leap to the answer in one fell swoop; you will fail.

To begin with, it is always worthwhile listing in some sort of order the information that

you can glean from the question. It may or may not be useful but at least you will know

everything about the problem. This information is more often best shown on a

thumbnail sketch.

 

Remember that you will also need your BS7671 Requirements (Regs) with you, and

your On-Site Guide.

 

 

Beginning at page 192 of BS7671 (current edition) there are a series of tables. These

tables give information that is often necessary for an accurate calculation.

Table 4A gives information on the installation method, i.e. how the cable is

installed in the property.

Tables 4B1 to 4B3 give correction factors for grouped cables. These are

necessary because when cables run close to each other they are not able to give

off their heat at the same rate and some allowance must be made for

overheating.

Tables 4C1 and 4C2 give correction factors for cables run in temperatures

other than 30°C. Cables are designed with an assumption that they will run in

an environment that has a temperature of 30°C, anything different requires that

we provide a multiplying figure to the calculations.

Here is our question again.

1/. A 3kW heater is supplied from a 230V, 50Hz supply. The circuit is protected

using BS3036 (rewirable) fuses and is situated 15m away from the distribution

board. It is run with one other circuit and is buried within the building material

of the installation. The temperature within the installation can be assumed to be

25°C.

 

 

Column 1 is just a number. Column 2 gives a brief description of the installation

method. Column 3 shows a simple diagram and column states what Reference Method

is being used.

For our particular example as the cable is buried within the fabric of the building, we

will choose, from page 192, number 2, ‘Cables embedded directly in building

materials’, which is Method 1.

Make sure you are following all of this.

The second piece of information we can get is to do with the type of protective device

used.

A BS3036 rewirable fuse has a fusing factor of two. The consequence of this is that we

need to effectively downgrade the cable.

 

 

 

Regulation 433-02-03 states that a factor of 0.725 must be applied to any calculation

containing a BS3036 fuse. This factor is applied because cables are designed to

withstand current 1.45 times greater than the current rating of the protective device.

Because a BS3036 fuse has a fusing factor of 2 a de-rating of the cable needs to take

place.

Another factor is the ambient temperature that surrounds a cable. Cables are designed

to withstand ambient temperatures of 30°C. If the ambient temperature falls below

30°C then more current can be allowed to flow, if the temperature rises above 30°C

then less current can be allowed to flow.

In this example, for a temperature of 25°C if you look at Table 4C2 on page 199, you

will see a table with a list of cable insulation types and a row with operating

temperatures. Table 4C2 is used because we are using BS3036 fuses.

 

 

 

 

For our example then, with an ambient temperature of 25°C and the insulation material

being PVC, the correction factor is 1.03.

The final correction factor is that caused by grouping. Grouping has to be taken into

account when cables are placed close to each other. When they are close and both carry

current they are helping to warm each other up. This means that the cables can overheat

and extra precautions need to be taken to compensate for this.

 

 

Table 4B1 on page 197 lists the correction factors applied when quantities of cables are

near each other. This table has a column for the reference method of the installation and

a series of columns listing the values given for certain quantities of circuits. For our

example, we have run our cable with one other circuit so there must be two circuits

grouped. With an installation method of 1 our correction factor is 0.80.

It is worthwhile listing all the information that we have.

1/. A 3kW heater is supplied from a 230V, 50Hz supply. The circuit is protected

using BS3036 (rewirable) fuses and is situated 15m away from the distribution

board. It is run with one other circuit and is buried within the building material

of the installation. The temperature within the installation can be assumed to

be 25°C.

Installation reference method:

Table 4A; Method 1 Cables embedded in building materials.

Correction for BS3036 fuse:

0.725.

Correction for ambient temperature Ca:

Table 4C2; General purpose PVC; 25°C; Column 2; Ca=1.03.

Correction for grouping Cg:

Table 4B1; Reference method 1; Column 2: Cg=0.80.

Now that we have gathered all the information that we need, it would be worthwhile

drawing a thumbnail sketch.

 

 

 

In any cable calculation, the process is all-important. Do not try to take short cuts. The

order in which things are done is as follows:

Determine the design current (Ib). This is the current found using the power

 

 

Find the protective device size (In). This is determined because the cable will

have to be capable of carrying the full rating of the fuse. If we only picked a

cable capable of carrying the design current, the cable may be liable to

overheating.

 

Determine the current carrying capacity of the cable (It). This takes account of

all the correction factors we have found.

 

Find the actual current carrying capacity from the tables in BS7671.

 

 

Once you have picked a cable size, determine the volt dropped in the

cable due to its resistance and the current flowing in it.

The design current should be no greater than the fuse rating. The fuse rating must be no

greater than the current carrying capacity of the cable. The current carrying capacity of

the cable should not be greater than the tabulated capacity of the cable.

 

 

Notice that the tabulated current is greater than the current carrying capacity; the

current carrying capacity is greater than the fuse rating, and the fuse rating is greater

than the design current. This is how it should always be!

The value for the tabulated current carrying capacity is found in that tables beginning

on page 200 (4D1A). These tables list the type of cable insulation and the type of

conductor. It is essential to choose the right one. In our example, table 4D2A was

chosen as we are using PVC/PVC twin and c.p.c. This makes this a multi-core cable as

far as BS7671 is concerned.

Values of In can be found in the table on pages 41 and 42 of BS7671.

We’ll now look at the volt drop in the cable.

 

 

In this instance the mV/A/m is found from Table 4D2B. Those tables that are labelled

with a B are usually providing information on the volt drop of the cable. The figure that

is given is the resistance per metre in mΩ (milli-Ohm).

If the voltage dropped is greater than 4% of the supply voltage we really need to look at

increasing the size of the cable. For a 230V supply, a 4% volt drop would be 9.2V.

This means that we are well within the 4% limit.

 

 

 

This requirement requires that we consider the whole of the installation, from

beginning to end, and not just on each individual circuit.

Look at the diagram below.

 

 

The 4% is from start to finish.

I realise that this has seemed like a long process but now try an example without having

everything explained.

 

 

 

 

 

 

 

 

 

 

 

 

 

2/. A 7.6kW single-phase load is fed from a distribution board 25m away. The

load is fed via PVC singles and the cable is run on its own in steel conduit on

the surface, and is protected via a BSEN 60898 Type B circuit breaker. The

cable is run in an area where the ambient temperature is 35°C. Determine the

size of cable required.

Remember the housekeeping! Try drawing a diagram.

 

 

 

 

 

 

 

The value of mV/A/m is found in Table 4D1B. This table is on page 201, opposite

table 4D1A.

Notice the column that I used. The figures relate to not only the number of conductors

but also to the reference method and the number of phases that are present.

For all your calculations, at present, you must follow the same process. Don’t take short

cuts. It is also true that I am not telling you everything that you need or may need to do.

We’ll have another look at cable calculations in more detail when you work through the

higher-level study books.

At this level, it is enough that you are able to calculate everything up to and including

the voltage drop.

We are coming to the end of this study book but try following this last calculation

before attempting the final exercise.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3/. An upstairs lighting circuit is wired in PVC/PVC cable. It is run with

insulation surrounding it for a distance of 0.5m, although its total length is

30m. There are 8 lights on the circuit, and the circuit is protected via a 5A

BS3036 fuse. If the ambient temperature is 30°C and there is no grouping,

determine an appropriate cable size.

The first question you have to ask yourself is, ‘What load is each light?’ Although the

old 15th Edition used to give some guidance, BS7671 doesn’t. If you look in your On-

Site-Guide at Appendix 1 on page 67, Table 1A, there is a series of assumed demands

for particular loads. For our case, a light point can be assumed to have a load of 100W.

Remember the diagram and the housekeeping.

 

 

Grouping

No factor applies

Ambient temperature

No factor applies

Installation Reference Method

Table 4A; No.1; Method 1

Insulation

Reg.523-04-01; Ci=0.5

BS3036 fuse

Reg.433-02-03; Factor=0.725

 

 

 

 

Notice how very nearly we had to increase the cable size just because we ran the cable

through roof insulation. It is worthwhile noting the effect that insulating material has

and trying to avoid it!

In this instance though, we are allowed to run our lighting circuit in 1mm2 PVC/PVC

cable.

 

 

 

 

 

 

 

 

 

 

&#x...