Repair_-_Soldering_Procedures.doc

(6896 KB) Pobierz
GSM Platform 2000 Generic Triton Chipset 12M

 

m

Repair Methods

Rev.1.0

Page 38 of 38

14 June 2007

             

 

 

 

 

 

 

Lead-Free

 

Underfill/Underfirm

 

POP (Part on Part)

 

Repair Procedures

 

Revision 1.0

14 June 2007

 

 

 

AP SERVICE ENGINEERING

 

This document and the information contained in it is CONFIDENTIAL Information of Motorola, and shall not be used, or published, or disclosed, or disseminated outside of Motorola in whole or in part without Motorola, Mobile Devices, Service Engineering

 

Revision History

 

Issue

Description of Release Change(s)

Originator

Date

1.0

Initial Release

Patrick Goh

 

14 June 2007


Table of Contents

 

1.0              Introduction              4

1.1              Scope              4

1.2              Terms And Acronyms              4

1.3              Safety and ESD Precautions              4

1.4              Housekeeping              4

2.0              Lead Free              5

2.1              Equipment/Tools Set-up              5

2.2              Procedures              6

2.2.1              Removal of SMD Components              6

2.2.2              Removal of BGA Components              6

2.2.3              Placement of BGA Components              7

2.3              Inspection Criteria              7

3.0              Underfill/Underfirm Rework Procedures              8

3.1              Equipment/Tools Set-up              8

3.2              Underfill Rework Process              9

3.3              Underfilrm Rework Process              11

4.0              POP Parts Replacment              13

4.1              Equipment/Tools Set-up              13

4.2              Procedures              14

4.2.1              Set-up for POP IC Removal              14

4.2.2              POP IC Removal              14

4.2.3              POP - Argon IC Placement              16

4.2.4              Argon IC Current Check              17

4.2.5              POP – Flash IC Placement              18

4.2.6              Argon and Flash IC Current Check              18

4.2.7              Software Upgrading Procedures              19

4.2.8              POP IC Shield Placement              20

5.0              Appendix A - DIY Air Cooling System              21

6.0              Appendix B – Heat Shielding Methods              26

6.1              Using Kapton Tape on recycled shields              26

6.2              Using Enhanced Heat Shielding Tape on recycled shields              27

5.3              Using Aluminium Blocks to cool ICs              29

7.0              Appendix C – Soldering Visual Inspection              31

7.1              Purpose              31

7.2              Insepction Criteria              31

 


1.0             Introduction

 

 

1.1     Scope

 

This document describes procedures to PCB repair Lead-free (ROHS), Underfill/Underfilm production process, Removable Shield required for underfill/underfilm parts and special IC replacement for POP products

 

1.2     Terms And Acronyms

 

 

Acronyms / Terms

Definition / Description

ROHS

Restriction of Hazardous Substances

POP

Part on Part

BGA

Ball Grid Array

PCAP

Power Management IC

POG

DSP IC

NEPTUNE 

DSP IC

BULVERDE

DSP IC

ATLAS

Power Management IC

IPA

Isoprophyl Alcohol

SMD

Surface Mouint Device

UNDERFILL

Encapsulant material typically deposited between a flip chip device and substrate to reduce a mismatch in thermal expansion coefficients

UNDERFIRM

A polyurethane film that is machine placed in all four corners of the BGA package before the BGA is placed on the PCB. The reflow process

adheres the film to the PCB and to the bottom of the component and provides a mechanism to reduce the strain on the solder bump

LEADFREE

"Lead-free / Pb-free" means that Pb has been removed which is required by the ROHS legislation and regulation

 

1.3     Safety and ESD Precautions

 

When performing any soldering tasks, following guidelines must be adhered upon :

 

·         Wear ground strap prior to the start of any reball operation.

·         Personnel with long hair must tie up neatly

·         Wear finger cots.

·         Do not touch the hot air  nozzle.

·         Do not direct any hot air / gases unto any part of the body.

·         Do not place any flammable material in the vicinity of the hot air / gas nozzle.

 

1.4     Housekeeping

·         Make sure to keep the rework area cleanliness and tidiness at all times

 

 


2.0             Lead Free

 

2.1     Equipment/Tools Set-up

 

Manufacturer:

Description

Type

Remark

Weller

Solderstation

WSD81

Or Similar for lead free use.

Metcal

...