Supplier Quality Assurance Manual [ENG].pdf

(1155 KB) Pobierz
196425019 UNPDF
Management System Procedure
Section
LcvcliFacility
Number
Rcvision
Effectivity
Page
4.06
30
004
H
7/17/2006
1 of 13
Title
Supplier Quality Assurance Manual
Special Devices, Incorporated
Supplier Quality
Assurance
Manual
Special Devices, Incorporated
"Statement of Quality Policy',
"Customer satisfaction is tlze most important element in tlze success of SDI. Efficient
manufacture of lt iglz qualityproducts and on time delivery tlzrouglz continuous improvement will
insure customer sntisfaction. Continuous improvement will be aclzieved tlzrouglt knowledge,
commitment and teamwork of all SDI employees."
Note: This manual supersedes all previous forms of Special Devices, Inc. Supplier Quality
Assurance Manual, and is to be used in lieu of anyla11 previous manuals.
196425019.002.png
Management System Procedure
Section
LcvclIFacility
Number
Revision
Effcctivity
Page
4.06
30
004
H
711 712006
2 of 13
--
Title
Supplier Quality Assurance Manual
TABLE OF CONTENTS
1.
Introduction
1.1 Policy and Vision
1.2 Purpose
1.3 Scope
1.4 Responsibility
2.
Quality System Requirements
2.1 ISOITS 16949: 2002 and Alternatives
2.2 Prototype Fabrication and Quality Evaluation
2.3 Special Characteristics
2.4 Advanced Product Quality Planning (APQP) and Launch Readiness Reviews
2.5 Production Part Approval Process (PPAP)
2.5.1 PPAP Document
2.5.2 Prohibited/Reportable/Recyclable Materials
2.5.3 Annual Product Verification
2.6 Run-at-Rate Analysis
2.7 Packaging
2.8 Lot Identification, Marking and Lot Traceability
2.8.1 PPAP and Engineering Use Only Labels
2.9 Supplier Request for Action
2.9.1 Deviations - Waivers
2.10 Drawing Revisions and Changes
2.10.1 Single Part Number Drawings
2.10.2 Multiple Part Number Drawings
2.1 1 Concern Management
2.11.1 Containment / Certification of Sort
2.1 1.2 Rework
2.11.3 Root Cause Analysis and Permanent Corrective/Preventive Action
2.12 Supplier Performance Reporting
2.12.1 Parts-Per Million (PPM)
2.12.2 On-Time Delivery
2.12.3 Performance Reports
2.13 Record and Product Sample Retention
2.14 Contingency Plan
196425019.003.png
Management System Procedure
Scction
Levclffacility
Number
Revision
Effectivity
Page
4.06
30
004
H
7/17/2006
3 of 13
Title
Supplier Quality Assurance Manual
Reference Documents
AS9100
AIAG B- 10 "Trading Partners Labels Implementation Guide"
AIAG Manual "Production Part Approval Process" (PPAP)
AIAG Manual "Measurement System Analysis" (MSA)
AIAG Manual "Potential the Failure Mode and Effects Analysis" (FMEA)
AIAG Manual "Statistical Process Control" (SPC)
AIAG Manual "Advanced Product Quality Planning (APQP) and Control Plan"
European Union End-of-Life Vehicles (ELV) Directive (2000153lEC)
Amendment to Annex I1 (20021525lEC)
IS0 9001:2000
ISOITS 16949:2002
ISOITS 16949: 2002 "Quality System Assessment" (QSA)
Note: AIAG manuals may be obtained from www.aiag.org.
Forms
Request For Corrective/Preventive Action (RFCA)
SDI PPAP Requirement Checklist
Supplier Assessment Survey
Supplier Request For SDI Action (RFA)
Run @ Rate Analysis
Note: Electronic copies of all forms are available on our website or upon request. Please
visit www.specialdevices.com/supplier.html or contact your SDE.
196425019.004.png
Management System Procedure
Section
LcvclIFacil~ty
Number
Revision
Effectivity
Pagc
4.06
30
004
H
7/17/2006
4 of 13
T~tle
Supplier Quality Assurance Manual
1. INTRODUCTION
1.1 Policy and Vision
It is the policy of SDI to achieve a clear competitive advantage through continuous
improvement in quality, service, delivery and cost from our suppliers. It is the vision of SDI
that suppliers shall adopt Continuous Improvement processes by promoting lean
manufacturing principals and the use of six-sigma analysis tools.
1.2 Purpose
The purpose of this Supplier Quality Assurance Manual is to specify SDI quality system
requirements for our suppliers. These requirements extend from supplier selection, to new
product development, to production.
1.3 Scope
This manual describes the quality system requirements for current and prospective suppliers
of materials to Special Devices, Incorporated. The manual is under the control of Supplier
Development Engineering (SDE). SDE is responsible for supplier evaluations, by assessing
their conformance to the system and process requirements of this manual.
1.4 Responsibility
Suppliers are responsible for complying with the Supplier Quality Assurance Manual
requirements. Failure to meet these requirements may result in the loss of existing and/or
future SDI business. It is recommended that suppliers encourage their direct material/service
suppliers to be compliant with IS0 9001:2000 and for automotive suppliers, ISO/TS
16949:2002. Suppliers shall adopt a goal of Zero (0) Parts-Per-Million (PPM) defects and
10O0/0 On-Time Delivery to SDI.
196425019.005.png
Management System Procedure
Section
Levelffacility
Nuinber
Revision
Effectivity
Page
4.06
30
004
H
7/17/2006
5 of 13
Title
Supplier Quality Assurance Manual
QUALITY SYSTEM REQUIREMENTS
ISO/TS 16949:2002 and Alternatives
Suppliers shall be registered to IS0 9001 :2000. Automotive suppliers should strive to be
compliant with ISOITS 16949:2002. Suppliers of aerospaceldefense products should strive to
be compliant with AS9100. Suppliers that are not ISOITS registered maybe audited by SDI
Supplier Development Engineering (SDE). Suppliers that are not IS09001 :2000 registered
must supply a schedule to the SDE detailing their plans to become registered. The audit will
determine if the supplier complies with all applicable elements of the latest edition of the
applicable industry Quality Systein Requirements, including all supplements and reference
manuals, including:
Quality System Assessment Checklist to ISOITS 16949 or applicable industry
standard
Production Part Approval Process (PPAP)
Advanced Product Quality Planning and Control Plan (APQP)
Potential Failure Mode and Effects Analysis (FMEA)
Measurement System Analysis (MSA)
a Statistical Process Control (SPC).
Should a quality system audit be necessary, the SDE will schedule the assessment audit with
the supplier. The audit will be conducted using the QSA or SDI Supplier Assessment
Survey (APD-QA0345), unless otherwise specified. The audit will include:
Documentation of audit results
Identification of concerns or issues
Action plan to correct deficiencies, if needed. The Action Plan will include action(s)
the supplier must take to resolve those issues that were identified during the audit,
including establishing target completion date(s) for each action, and the name of the
responsible individual for completion of the action item.
Prototype Fabrication and Quality Evaluation
In fabricating prototypes or pre-production parts, suppliers should mimic the planned
production process to the greatest extent possible. Suppliers inay be requested to provide
material certifications, dimensional performance or process data.
196425019.001.png
Zgłoś jeśli naruszono regulamin